What are the preparations for car carrier trailer operation
Technical preparation before car operation:
1. The engine part shall be carried out in accordance with the relevant provisions of the general operating procedures.
2. A signal should be sent before starting or operating the engine.
3. Check whether there is any leakage in the hydraulic system, check whether the tires are intact and whether the air pressure meets the regulations.
4. Understand the construction tasks and site conditions in detail. Check the solidity and stability of the soil where the vehicle is parked and it should be supported to keep it stable and reliable. Check the stability of road cuttings and trench slopes to prevent vehicles from overturning.
5. It is strictly forbidden for any personnel to stay in their working area. No unauthorized persons are allowed to enter the cab.
If the car's engine suddenly stalls during operation, it is mostly due to a circuit failure; if it gradually stalls, it is mostly due to an oil circuit failure; when the engine has no response when starting, it is mostly due to no oil or no piezoelectricity, etc. You can summarize the phenomenon and location of the failure to avoid malfunctions in the car.
Post time:Jun-20-2020
RELATED NEWS
- How many cars can be transported by a car carrier semi trailer 23-11-09
- The box-type semi-trailer manufacturer summarizes the structural characteristics 17-01-05
- What issues need to be paid attention to when transporting vehicles? 16-06-10
- Pay attention to driving flatbed semi-trailers in winter 17-01-21
- Introduction to semi-trailer manufacturers Features of wingspan semi-trailers 16-06-09